Doors are complicated.

This past weekend my father in law came over and we worked aggressively on building the doors for this biggest of big summer projects: The Shed of 2015.

Prior to the final website post which will hopefully show up next week (if I’m done with the shed by then), here’s a quick approximation of the amount of time for each portion of this project:

Foundation: 18 hrs
Framing: 20 hrs (almost entirely prep time)
Siding and roofing: 8 hrs
Shingling: 12 hrs
Windows: 6 hrs
Trim: 12 hrs
Door: 8 hrs
Trips back and forth from the local hardware store to pick up the random forgotten fastener: 7000 hrs

The most surprising part so far? THE DOORS TOOK AN ENTIRE DAY TO BUILD.

I’m stunned at how complicated doors are. Granted, the doors that I designed were a bit more elaborate than your run of the mill plywood doors. These were constructed as tongue and groove cedar planks with z-battens on the back and attractive trim-stuffs on the front. BUT STILL! A whole day for two 24″ wide doors? I’m genuinely surprised.

So what’s left before I can post the full recap? Not too much. Corner trim, door hardware, and edge trim for the exterior. The interior only requires some final window work, peg-board, and perhaps a shelf or two.

We are CLOSE.